Installation Precautions For Solenoid Valves
1. During installation, please note that the arrow on the valve body should be consistent with the flow direction of the medium. Do not install it in a place where there is direct dripping or splashing water. The solenoid valve should be installed vertically upward.
2. The solenoid valve should ensure normal operation within the fluctuation range of 15%-10% of the rated voltage of the power supply voltage.
3. After the solenoid valve is installed, there should be no reverse pressure difference in the pipeline. It needs to be powered on several times to make it suitable for temperature before it can be officially put into use.
4. The pipeline should be thoroughly cleaned before the solenoid valve is installed. The medium introduced should be free of impurities. Install a filter before the valve.
5. When the solenoid valve fails or is cleaned, a bypass device should be installed to ensure the continued operation of the system.